Bid Tabulations Archive
Thank you for visiting our bid tabulation page. Here we post all bid tabs to our Invitation To Bid (ITB) events. In order to provide transparent results for our events, we strive to post bid tabulations no later than 24 hours following the close of the solicitaiton event. At times, the bid tabulations are delayed as we verify documents submitted for events or process a large number of events closing at the same time. Thank you for your understanding.
-
ITB # A24-4335-JG - Highland Senior Athletics Improvements Project # 3082-23-01
-
ITB # A24-4336-JG - Como Senior Athletics Project # 4110-23-01
-
Multiple Workscopes (see below) Project #3081-23-01 Highland Park Middle School Entry Addition and Renovation
-
Barack and Michelle Obama School Addition and Renovation - Project # 3210-23-01 - Multiple Work Scopes (see below)
-
ITB # A24-3977-JG - RONDO ARP HVAC Upgrades Project # 3170-22-01
-
ITB # A24-4166-JG - Randolph Heights ES Boiler Replacement - Project # 3150-22-02
-
ITB # A24-4036-JG - Barack and Michelle Obama School Addition and Renovation Project # 3210-23-01
-
Multiple Workscopes (see below) Bid Package # 2 - Project # 1020-22-01 - Bruce Vento Elementary New Construction
Bid Tabulations:
BP2-02A Existing Conditions and Demolition_Rev1_10-16-23.pdf - added on 10/17
BP2-04A - Masonry_10-06-23.pdf - added on 10/16
BP2-05C_EMisc_Metals_Material_10-06-23.pdf
BP2-05D_Misc_Metals_Erection_10-06-23.pdf
BP2-06A_Carpentry_10-06-23.pdf
BP2-07A_Waterproofing_and_Weather_Barrier_10-06-23.pdf
BP2-07B_Architectual_Metal_Panels_10-06-23.pdf
BP2-07C_EPDM_Roofing_10-06-23.pdf
BP2-08A_Doors_Frames_Hardware_Materials_10-06-23.pdf
BP2-08D_-_Aluminum_Framing_Glazing_10-06-23.pdf
BP2-09A_-_Gypsum_Board_Assemblies_10-06-23.pdf
BP2-09C_-_Acoustical_Ceilings_10-06-23.pdf
BP2-09D_Carpet_Resilient_Athletic_Flooring_10-06-23.pdf
BP2-09F_-_Painting_Vinyl_Wallcovering_10-06-23.pdf
BP2-11A_-_Food_Service_10-06-23.pdf
BP2-14A_-_Hydraulic_Elevators_10-06-23.pdf
BP2-21A_-_Fire_Suppression_Systems_10-06-23.pdf
BP2-22A_-_Plumbing_Systems_10-06-23.pdf
BP2-23B_-_HVAC_Systems_10-06-23.pdf
BP2-26A_-_Electrical_Systems_10-06-23.pdf
BP2-27A_-_Voice_Data_Systems_10-06-23.pdf
BP2-27B_-_Audio-Visual_Systems_10-06-23.pdf
BP2-28A_-_Fire_Alarm_Systems_10-06-23.pdf
BP2-28B_-_Security_Systems_10-06-23.pdf
-
Bid Package #2 Multiple Scopes - Hidden River Middle School Renovations and Additions and Wilson School Modifications Project # 3140-20-02
-
Multiple Workscopes (see below) - Project # 3140-20-02 - Hidden River Middle School Renovation and Addition and Wilson School Modifications
-
Multiple Workscopes (see below) - Project # 1020-22-01 - Bruce Vento Elementary New Construction
-
RFP # A23-3255-MC - Title I Third Party Vendor
-
ITB # A23-3542-JG - Griffin Stadium Electrical Service Replacement Project Num. 3021-22-01
-
ITB # A23-3501-JG - Frost Lake – New Storage Building Project Description Project Num. 1100-19-01
-
ITB # A23-3481-JG - FY22 ROOF REPLACEMENT: Multiple Sites Project Description Project Num. 0175-22-01
-
ITB #A-22-7311-MO Farm to School Produce for SPPS
-
ITB # A-227163-MO - Prime Vendor for Farm to School Produce Processor
-
ITB # A23-3422-JG - Roof Replacements: Groveland Park El, Wellstone El, Johnson Sr Project # 0175-22-01
-
ITB # A23-3423-JG - Classroom A/V Technology Upgrades Project # 0680-23-01 at Central High School & LEAP @ John A Johnson
-
ITB # A23-3388-JG - Creative Arts ARP HVAC Upgrades Project # 2170-22-01
-
ITB # A23-3276-JG Jie Ming Mandarin Immersion Academy Addition and Renovation – Part 2 -WS 32C – Landscaping
-
ITB # A23-3275-JG Jie Ming Mandarin Immersion Academy Addition and Renovation – Part 2 - WS 32B – Site Concrete
-
ITB # A23-3274-JG Jie Ming Mandarin Immersion Academy Addition and Renovation – Part 2 - WS 32A – Bituminous Paving
-
ITB # A23-3273-JG - Jie Ming Mandarin Immersion Academy Addition and Renovation – Part 2 - WS 31A – Earthwork, Utilities, Demolition
-
ITB # A23-3261-JG - Crossroads Elementary Science + Montessori Programs Project # 4120-24-01
-
ITB A23-3076-JG - Print Copy Mail Center Air Handling Unit Replacement Project # 4000-23-02
-
ITB # A23-2908-JG - Theater Upgrades – Multiple Sites
-
ITB A23-2810-JA AIMS Locker Rebid
-
Jie Ming Mandarin Immersion Academy Addition and Renovation – Part 2 Bid Package #4 Re-bids
Bid # A22-2445-JA-REBID, WS 08D – Coiling Doors & Grilles
Bid # A22-2449-JA-REBID, WS 09D – Carpet & Resilient Flooring
-
Solicitation: A22-2606-JG - EOS - ARP Kitchen HVAC Upgrades Project # 4000-22-01
-
Mississippi Creative Arts Elementary School ARP HVAC Upgrades
-
Solicitation: A22-2605-JG - Maxfield - ARP HVAC Upgrades Project # 4180-22-01 - Pre bid is mandatory
-
Highland Park MS ARP HVAC Upgrades - see Workscopes
-
ITB A22-2554-JG - Classroom A/V Technology Upgrades at Harding Senior and Murray Middle Schools.
-
Jie Ming Bid Package #4 - See Workscopes below
Bid # A22-2434-JA, WS 01A – General Trades / Carpentry
Bid # A22-2436-JA, WS 04A – Unit Masonry
Bid # A22-2437-JA, WS 05B – Misc. Metal Fabrications / Stair Systems / Ornamental Metals
Bid # A22-2438-JA, WS 05C – Steel Erection
Bid # A22-2440-JA, WS 07B – Metal Wall Panels
Bid # A22-2441-JA, WS 07E – Waterproofing & Weather Barriers
Bid # A22-2442-JA, WS 07I – Joint Sealants
Bid # A22-2443-JA, WS 08A – Doors, Frames, & Hardware (Fabrication)
Bid # A22-2444-JA, WS 08B – Entrances & Storefronts / Alum Windows / Curtain Walls / Glazing
Bid # A22-2445-JA, WS 08D – Coiling Doors & Grilles
Bid # A22-2446-JA, WS 09A – Gypsum Board Assemblies
Bid # A22-2447-JA, WS 09B – Tile
Bid # A22-2448-JA, WS 09C – Acoustical Ceiling Tile & Wall Panels
Bid # A22-2449-JA, WS 09D – Carpet & Resilient Flooring
Bid # A22-2450-JA, WS 09E – Fluid Applied Flooring
Bid # A22-2451-JA, WS 09F – Resilient Athletic Flooring
Bid # A22-2452-JA, WS 09I – Painting / VWC
Bid # A22-2453-JA, WS 10C – Lockers (Fabrication & Installation)
Bid # A22-2454-JA, WS 10D – Folding Panel & Operable Partitions (Fabrication & Installation)
Bid # A22-2455-JA, WS 11A – Food Service Equipment
Bid # A22-2456-JA, WS 12B – Window Blinds & Shades
Bid # A22-2457-JA, WS 23A – HVAC & Plumbing Combined
Bid # A22-2458-JA, WS 26A – Electrical & Low Voltage
Bid # A22-2459-JA, WS 32A – Bituminous Paving
Bid # A22-2460-JA, WS 32B – Site Concrete
Bid # A22-2461-JA, WS 32C – Landscaping/ Irrigation
-
ITB A22-2315-JA REBID Carpet Replacement
-
ITB A22-2287-JA WS 21A – Jie Ming Fire Protection
-
ITB A22-2288-JA WS 31A – Jie Ming Earthwork, Utilities, Building Demolition
-
ITB A22-2380-JA WS 26B – Jie Ming Electrical Temporary Conditions
-
ITB A22-2379-JA WS 23B – Jie Ming Plumbing & HVAC Temporary Conditions
-
ITB A22-2284-JA WS 02A – Jie Ming Selective Demolition & Temporary Conditions
-
ITB A22-2286-JB Jie Ming WS 05A – Structural Steel, Joist, Decking, Metal Fabrication
-
ITB A22-2285-JB Jie Ming WS 03A – Cast-In Place Concrete
-
ITB A22-2300-JB Humboldt Athletic Improvements
-
ITB A224391-DW NS Equipment Purchase
-
Bid A22-2209-JB Jie Ming WS 7A Roofing
-
A22-1687-A Window Replacement @ Riverview ES
-
Bid A20-0747 Bridgeview Re-roofing
-
Bid #A21-1265 Linwood Upper - Tile & Wall Repair
-
A220940-A Nutrition Services Food Truck
Nutrition Services Food Truck
-
A220768-A Nutrition Services Equipment
- Closed Thursday 1/7/2021 2:00 PM
- Bid Tabulation
-
A21-1097-A REBID: Johnson HVAC Replacement
-
ITB A21-1215-A Farnsworth Locker Replacement
Opened: 12/29/2020 @ 2:00p.m.
-
Project A21-1201-A St Paul Music Academy Window Replacement
Project A21-1201 St Paul Music Academy Window Replacement
Opened: 12/1/2020 @ 2:00p.m.
-
Project A21-1097-A Johnson HVAC Replacement
Project A21-1097 Johnson HVAC Replacement
Opened: 11/24/2020 @ 2:00p.m.
All bids submitted for this solicitation are above the budget for this project. Due to bids being above the budget, SPPS will be adjusting the scope of this project and will be re-bidding at a later date.
-
Project 20-0836 Maxfield Flooring Replacement
-
Project #1100-19-01 Frost Lake ES Additn/Renovation
Bid tabulations for Frost Lake Elementary School Addtion and Renovation - Bid opening 4/28/2020 @ 2:00p.m.
Project Manager: Rosemary Dolata
Construction Manager: Kraus Anderson
-
Project #218951 Prime Vendor Nutrition Services
-
Project #0175-20-01 Roofing
No final awards have been determined at this time.
*Recommendations to award are expected to be made at the April Board of Education Meeting scheduled for April 28, 2020.
-
Bid #4000-16-01 District Service Facility Renovation
Final bid awards are subject to confirmation of each apparent low bidder and approval of the Board of Education.
-
Project #A116-19-01 American Indian Magnet School Addition & Remodel
AIMS Addition & Remodel bids closed 3/26/20 @ 2:0p.m.
Apparent low bidders and all awards are pending.
-
RFP #A120919-A CMMS for Facilities Dept
RFP#A120919-A Computerized Maintenance Management System for Facilities Department.
Awarded to: TMA Systems
Board of Education approved 3/24/2020
-
Bid # A20-0708-A AV Uppgrades
Classroom A/V Improvements at Music Academy, Gordon Parks, AGAPE Classroom
Bid opening: 3/19/2020 @ 2:00pm
-
Bid #A20-0673-A Athletic Site Imrovements
Project #A20-0673 Washington Tech H.S. Athletic Site Improvements
Bid opening: 3-19-2020 @ 2:00 p.m.
-
Bid #A20-0585-A Phalen Lake HVAC & Controls Replacement
-
Bid #A20-0450 Window Replacement Journeys.Wellstone
-
Project #4000-19-02 Kitchen Boiler Replacement
Bid tabulations for all Work Scopes: